An NOC is required for all buildings located in the airport's structural regulatory radius as per AAI Norms.
India's most trusted Airport NOC consultants with 15+ years of experience in obtaining AAI clearance for residential, commercial, and industrial projects across 25+ states.
Fill in your details and our experts will reach out within 24 hours.
We are India's leading AAI-approved airport NOC consultants with over 15 years of experience. Our team of certified professionals has successfully navigated the complex clearance process for 1000+ projects across 25+ states.
From initial surveys to final NOC issuance, we handle every aspect with precision and professionalism, ensuring 98% first-time approval rate.
End-to-end consulting services for all your airport clearance needs
Complete Airport No Objection Certificate clearance from AAI for buildings within 56 km radius as per DGCA norms.
High-precision Differential Global Positioning System surveys for accurate elevation and coordinate mapping.
Detailed topographic mapping with contour intervals for terrain analysis and building height calculations.
Obstacle Limitation Surface study to ensure compliance with airport zoning and height restrictions.
Complete preparation and submission of all required documents for AAI clearance approvals.
Ongoing support after NOC issuance including renewals, amendments, and compliance queries.
Providing Airport NOC solutions to diverse sectors across India
Residential and commercial projects requiring height clearance near airports.
Bridges, flyovers, and large infrastructure projects within airport zones.
Industrial facilities and warehouses needing NOC compliance.
Petroleum storage and distribution facilities near airport perimeters.
Power transmission towers and renewable energy installations in airport vicinity.
Telecommunication towers and antenna installations requiring AAI approval.
Government buildings and public infrastructure projects near airports.
Shopping malls, office buildings, IT parks, and business complexes near airports.
A proven 6-step process that ensures timely and successful NOC clearance
Free assessment of your project requirements and location analysis.
DGPS precision survey and topographic mapping of the project site.
Obstacle Limitation Surface analysis for height compliance check.
Complete preparation and compilation of all required documents.
Formal submission to AAI regional office with follow-up management.
Successful clearance and handover of your Airport NOC certificate.
We deliver excellence with every NOC project
15+ years of proven expertise in Airport NOC clearance
Advanced DGPS and surveying technology for precision
98% first-time approval rate with meticulous documentation
Timely project completion with proactive follow-ups
Coverage across 25+ states with local expertise
AAI-certified consultants and licensed surveyors
Complete documentation package for successful NOC clearance
Comprehensive survey data with accurate measurements and analysis
Detailed topographic maps showing elevation data and contours
High-resolution aerial imagery mosaic for site documentation
Obstacle Limitation Surface compliance report and analysis
* On special cases only
All necessary certificates for AAI NOC submission
Proud to serve top corporations and organizations across India
Real feedback from our satisfied clients across India
Real projects where we delivered exceptional results
Apex Builders
Challenge
200-acre township development within 15km of IGI Airport required comprehensive NOC clearance.
Solution
Completed DGPS survey, OLS study, and submitted complete documentation. Achieved AAI approval within 45 days.
Result
98% height clearance approved, project completed on schedule.
Skyline Developers
Challenge
Proposed 40-story tower in Cyber City required detailed aeronautical study.
Solution
Conducted obstacle limitation surface analysis with advanced GIS mapping.
Result
NOC obtained with maximum permissible height, saving client 15% in redesign costs.
Industrial Growth Corp.
Challenge
500-acre industrial park required NOC for multiple building structures.
Solution
Batch-processed all building applications with standardized DGPS surveys.
Result
Complete NOC clearance for 50+ buildings in 60 days.
Get answers to common questions about Airport NOC process
Ready to start your project? Contact us for a free consultation
+91 99716 41558
Mon-Sat 9AM to 6PM
ops@surveyingindia.in
We reply within 24 hours
New Delhi, India
Pan India Operations
Mon - Sat
9:00 AM - 6:00 PM